Dongguan Xin Bao Instrument Co., Ltd.

 

Your Leader in Reliability Test Equipment - Since 1978

Home ProductsLab Test Chamber

Three Phase Lab Test Chamber / Programmable Environmental Test Machine

Certification
China Dongguan Xinbao Instrument Co., Ltd. certification
China Dongguan Xinbao Instrument Co., Ltd. certification
This is my second cooperation with OTS, the machine is very good, and fast service. Look forward our next order.

—— Vinod Kumar Pandey

OTS is a very professional manufacturer for our customized machine. The quality is very surprising under such a friendly price.

—— Kohut Gabor

I visited OTS factory before order. I like their production machines, and experienced technicians. Now we have annual order from them, it is always a happy cooperation with them.

—— Chris 

I'm Online Chat Now

Three Phase Lab Test Chamber / Programmable Environmental Test Machine

Three Phase Lab Test Chamber / Programmable Environmental Test Machine
Three Phase Lab Test Chamber / Programmable Environmental Test Machine Three Phase Lab Test Chamber / Programmable Environmental Test Machine Three Phase Lab Test Chamber / Programmable Environmental Test Machine

Large Image :  Three Phase Lab Test Chamber / Programmable Environmental Test Machine

Product Details:
Place of Origin: China
Brand Name: OTS
Certification: CE Certification
Model Number: XB-OTS-800P
Payment & Shipping Terms:
Minimum Order Quantity: one set
Price: Negotiable
Packaging Details: Strong standard wood case, inner plastic films wrapped for Programmable IP5X IP6X Sand dust proof environmental test chamber
Delivery Time: 20 working day after getting the payment
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 100 Unit/Units per Month
Detailed Product Description
Model Numbe: XB-OTS-800P Product Name: Programmable IP5X IP6X Sand Dust Proof Environmental Test Chamber
Dust Concentration:: 2kg/m3~5kg/m3, Should Be Replaced Dust Type: Powdered Cement, Dry Talcum Powder
Blower: Centrifugal Fan Environment Temperature And Humidity:: 15~45c, 45~75%Rh
Sieves Hole Size: 75um Wire Netting Wire: 50um
Dimension: All Size Customized
High Light:

climate control chamber

,

walk in environmental chamber

Programmable IP5X IP6X Sand dust proof environmental test chamber
 
Testing Standard:
 
In accordance with IEC60529: 2001 "Degrees of protection provided by enclosures (IP Code)", GB4208-2008 "Shell protection class (IP code)" 13.4,13.5 terms and Figure 3 and GB7000.1 "Lamps Part I: General requirements and tests" 9.2.1, 9.2.2 and the requirements of Figure 6.
 
Usage:
 
The test chamber for low-voltage electrical appliances, electrical appliances, instruments, meters, lamps, household appliances and other products in the storage, transportation and use of sand and dust are often affected by the environment. Especially cars, electrical appliances by the impact of dust is more significant. This equipment is used artificial dust environment, to test the test of dust resistance of the test equipment, test specimens in this environment in the sealing and corrosion resistance
Three Phase Lab Test Chamber / Programmable Environmental Test Machine 0
 
Specifications :
 

Studio size80Lx80Wx80Hcm
Machine size170Lx130Wx170Hcm
Air pressure86~106kpa
Studio temperatureRT~60'C, adjustable
Powder quality2~4kg/m3
Powder typeTalc powder, Arizona dust
spirator flowing quantity0~6L/min
Pressure tolerance0~2kpa
Metal net sizewire range: 50um, wire scale: 75um
Testing time0~999h88m99s, adjustable
BlowerCentrifugal fan
Blowing dust cycleInterval control, adjustable
Chamber materialSUS#304 stainless steel
Door materialtempering glass
Control interfaceLCD touch screen
Power supplyAC380V±10%, 50/60Hz, three phase
Weight700kg
Vacuum systemssure gauge, air filter, Pressure regulating FRL, connecting pipe, Vacuum pump

 
Working principle of chamber:
 
Centrifugal fan is the main source of dust movement, the high-speed operation of the fan so that dust into the fan due to the centrifugal force of the role of fan blades into the dust pipe dust. The wind speed of the pipeline is usually more than 7.5m / s (too low wind speed will make the dust precipitate in the pipeline will cause the test tube can not work). The dust line was sprayed from above into the test chamber and passed through the sample at a rate of> 2 m / s. Sand and dust chamber As the lower part of the working box for the funnel, it can precipitate down the dust into the lower part of the 72 × 50um filter. Through the vibrating motor vibration, less than the diameter of the filter hole in the dust and centrifugal fan sucked so back and forth.
 
Three Phase Lab Test Chamber / Programmable Environmental Test Machine 1
Other inner chamber size for optional  (Also accept customized size )
 

TypeXB-OTS-800PXB-OTS-1000PXB-OTS-1500P
Inner dimensions (mm)800×800×8001000×1000×10001000×1500×1000
outside dimensions (mm)1200×1300×19001400×1500×21501450×2000×2300

 
 
 
Please feel FREE to contact us if you have any needs.

IP68 IP66 IP54 environmental simulation sand dust test chamber
IP68 IP66 IP54 environmental simulation sand dust test chamber
IP68 IP66 IP54 environmental simulation sand dust test chamber

 

JIS D 0207 F2 Dust Test Chamber To Verify Protection Against Dust

JIS  0207 F2 Dust Test Chamber To Verify Protection Against Dust
JIS D 0207 F2 Dust Test Chamber To Verify Pr
 
ote
 
 
ction Against Dust

Contact Details
Dongguan Xinbao Instrument Co., Ltd.

Contact Person: Elina Xu

Tel: +8613829114237

Send your inquiry directly to us (0 / 3000)